Quick answers
What is this project?
Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) of M/s Rungta Sons Private Limited, District Jharsuguda, Odisha is a proposed industrial project in Hansamurakatapali, Jharsuguda, Odisha. The site covers 346.7 acres.
Who is building it?
The applicant is Rungta Sons Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Hansamurakatapali, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹210.2 crore and a site of 346.7 acres.
When was it filed?
The application was filed on 9 Sept 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 9 Sept 2026 |
| Application filed | 9 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Rungta Sons Private Limited |
| Land area | 346.7 acres (140.3 ha) |
| Project cost | ₹210.2 crore |
| Village / locality | Hansamurakatapali |
| Taluk / tehsil | Jharsuguda |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03649 |
In context
38 applications in Jharsuguda since January 2022 are in the same category (Industry): 23 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 346.7 acres, this one is larger than 78% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hansamurakatapali, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (8.2 km away).
Other projects nearby
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) — initial checks, 0 m away
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) — environmental approval granted, 0 m away
- Provision of Fly Over — more information requested, 1.7 km away
- Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40… — environmental approval granted, 2.2 km away
- Diversion of 5.302 Ha forest land for non-forestry use for Integrated Steel… — lapsed, 2.2 km away
- Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40… — cleared for impact study, 2.2 km away
- Expansion of integrated steel plant (Sponge Iron (10,50,000 TPA); Pig Iron… — environmental approval granted, 2.2 km away
- Manufacturing of Direct Drawn High Carbon Spring Wire 1.40 Mm to 2.20 Mm,… — cleared for impact study, 3.1 km away
More from Rungta Sons Private Limited in Jharsuguda
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) — initial checks
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) — environmental approval granted
3 Rungta Sons projects in Jharsuguda
All 40 Rungta Sons projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.