Quick answers
What is this project?
Expansion of integrated steel plant (Sponge Iron (10,50,000 TPA); Pig Iron (10,60,000 TPA); Pellet Plant (6,00,000 TPA); Steel Melting Shop (10,50,000 TPA); Captive Power Plant (85 MW); Coal Washery (15,00,000 TPA) and Coke oven Battery (6,00,000 TPA) by M/s MSP Metallics Limited is an approved industrial project in Budipadar, Jharsuguda, Odisha. The site covers 266.7 acres.
Who is building it?
The applicant is Orissa Metaliks Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Oct 2023), as of 27 Nov 2026.
Where is it?
In Budipadar, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹2,461.3 crore and a site of 266.7 acres.
When was it filed?
The application was filed on 18 Sept 2023.
Project details
| Official title | Expansion of integrated steel plant (Sponge Iron (10,50,000 TPA); Pig Iron (10,60,000 TPA); Pellet Plant (6,00,000 TPA); Steel Melting Shop (10,50,000 TPA); Captive Power Plant (85 MW); Coal Washery (15,00,000 TPA) and Coke oven Battery (6,00,000 TPA) at Village - Marakuta, District Jharsuguda, Odisha by M/s MSP Metallics Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 23 Oct 2023 |
| Application filed | 18 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Orissa Metaliks Private Limited |
| Land area | 266.7 acres (107.9 ha) |
| Project cost | ₹2,461.3 crore |
| Village / locality | Budipadar |
| Taluk / tehsil | Jharsuguda |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00412 |
In context
38 applications in Jharsuguda since January 2022 are in the same category (Industry): 23 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 266.7 acres, this one is larger than 62% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Budipadar, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (9.7 km away).
Other projects nearby
- Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40… — cleared for impact study, 0 m away
- Diversion of 5.302 Ha forest land for non-forestry use for Integrated Steel… — lapsed, 0 m away
- Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40… — environmental approval granted, 50 m away
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished… — initial checks, 2.2 km away
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) — initial checks, 2.2 km away
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) — environmental approval granted, 2.2 km away
- Provision of Fly Over — more information requested, 3.8 km away
- H. Katapali Sand Bed-F — lapsed, 4.1 km away
More from Orissa Metaliks Private Limited in Jharsuguda
- Diversion of 5.302 Ha forest land for non-forestry use for Integrated Steel… — lapsed
- Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40… — environmental approval granted
- Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40… — cleared for impact study
4 Orissa Metaliks projects in Jharsuguda
All 9 Orissa Metaliks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.