What is this project?
Diversion of 5.302 Ha forest land for non-forestry use for Integrated Steel Plant, Captive Power Plant, Cement Grinding Unit and 132 KV Transmission Line of M/s Orissa Metaliks Private Limited (Formerly M/s MSP Metallics Private Ltd.) is a lapsed industrial project in Budipadar, Jharsuguda, Odisha. The site covers 280.3 acres.
Who is building it?
The applicant is Orissa Metaliks Private Limited.
Has it been approved?
No. The application was lapsed on 13 Mar 2026, so it is no longer under consideration.
Where is it?
In Budipadar, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹2,461.3 crore; a site of 280.3 acres and 11.8 acres (4.8 ha) of forest land.
When was it filed?
The application was filed on 29 Jan 2026.
Project details
| Official title | Diversion of 5.302 Ha forest land for non-forestry use for Integrated Steel Plant, Captive Power Plant, Cement Grinding Unit and 132 KV Transmission Line of M/s Orissa Metaliks Private Limited (Formerly M/s MSP Metallics Private Ltd.) situated in District- Jharsuguda, Odisha under Jharsuguda Forest Division. |
|---|---|
| Status | Lapsed |
| Status since | 13 Mar 2026 |
| Application filed | 29 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Orissa Metaliks Private Limited |
| Land area | 280.3 acres (113.5 ha) |
| Forest land | 11.8 acres (4.8 ha) |
| Project cost | ₹2,461.3 crore |
| Village / locality | Budipadar |
| Taluk / tehsil | Jharsuguda |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04448 |
In context
38 applications in Jharsuguda since January 2022 are in the same category (Industry): 23 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 280.3 acres, this one is larger than 70% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Budipadar, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (9.7 km away).
Other projects nearby
- Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40… — cleared for impact study, 0 m away
- Expansion of integrated steel plant (Sponge Iron (10,50,000 TPA); Pig Iron… — environmental approval granted, 0 m away
- Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40… — environmental approval granted, 50 m away
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished… — initial checks, 2.2 km away
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) — initial checks, 2.2 km away
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished Steel) — environmental approval granted, 2.2 km away
- Provision of Fly Over — more information requested, 3.8 km away
- H. Katapali Sand Bed-F — lapsed, 4.1 km away
More from Orissa Metaliks Private Limited in Jharsuguda
- Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40… — environmental approval granted
- Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40… — cleared for impact study
- Expansion of integrated steel plant (Sponge Iron (10,50,000 TPA); Pig Iron… — environmental approval granted
4 Orissa Metaliks projects in Jharsuguda
All 9 Orissa Metaliks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.