Quick answers
What is this project?
Expansion of Aluminium Smelter Plant production capacity from 4.6 LTPA to 9.57 LTPA at Gopinathpur, Kangula and Kulad villages, Angul district, Odisha is a proposed industrial project in Gopinathapur, Nalco, Anugul, Odisha. The site covers 1,186.9 acres.
Who is building it?
The applicant is Nalco.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Apr 2026), as of 27 Nov 2026.
Where is it?
In Gopinathapur, Nalco, Anugul, Odisha.
How big is it?
It has a stated cost of ₹28,163.1 crore and a site of 1,186.9 acres.
When was it filed?
The application was filed on 4 Jun 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Apr 2026 |
| Application filed | 4 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Nalco |
| Land area | 1,186.9 acres (480.3 ha) |
| Project cost | ₹28,163.1 crore |
| Village / locality | Gopinathapur |
| Taluk / tehsil | Nalco |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00608 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 3 Sept 2026 | Lapsed | 1,186.9 acres | ₹28,163.1 crore |
| Early planning filed 4 Jun 2024 (this page) | Cleared for impact study | 1,186.9 acres | ₹28,163.1 crore |
In context
17 applications in Anugul since January 2022 are in the same category (Industry): 11 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1,186.9 acres, this one is larger than 53% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gopinathapur, Nalco, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Aluminium Smelter Plant production capacity from 4.6 LTPA to 9.57… — lapsed, 0 m away
- Proposed Industrial Building having total built up area 28662.77 Sqm over… — environmental approval granted, 3.1 km away
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) to 2,280 MW (Addition… — under environmental review, 4.4 km away
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) Sub-critical Captive… — returned to applicant, 4.5 km away
- 200 Beded Multi speciality Hospital at: Kangula, Tahasil- Anugul, Dist:… — lapsed, 7 km away
- Environmental Clearance for Production of country Liquor from the… — environmental approval granted, 7.1 km away
- Composite multistoried building (EWS, LIG, MIG & HIG Residential appartments)… — initial checks, 7.1 km away
- Transfer of Approval Under Section 2 of the F.C. Act, 1980 for Diversion of… — more information requested, 9.2 km away
More from Nalco in Anugul
- Utkal D & Utkal E Coal Block (ML Area 824.316 ha) — under environmental review
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) to 2,280 MW (Addition… — under environmental review
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) Sub-critical Captive… — returned to applicant
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted
- Modification in existing ECs of Utkal D Coal Block (ML Area 301.28 ha with… — environmental approval granted
- Transfer of EC Letter No J-11015/31/2007-IA.II (M) dated 10.12.2009 granted by… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.