Quick answers
What is this project?
Environmental Clearance for Production of country Liquor from the manufacturing unit of M/s Banarpal main O.S Shop At/ Mouza- Nuahata, Tahasil- Banarapal, District- Angul in favour of the Licensee Sri Bikram Kishore Sahoo is an approved industrial project in Nuata, Banarpal, Anugul, Odisha. The site covers 0.7 acres.
Who is building it?
The applicant is Bikram Sahoo.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Nov 2024), as of 27 Nov 2026.
Where is it?
In Nuata, Banarpal, Anugul, Odisha.
How big is it?
It has a stated cost of ₹96 lakh and a site of 0.7 acres.
When was it filed?
The application was filed on 4 Apr 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Nov 2024 |
| Application filed | 4 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Bikram Sahoo |
| Land area | 2,900 m² |
| Project cost | ₹96 lakh |
| Village / locality | Nuata |
| Taluk / tehsil | Banarpal |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01565 |
In context
17 applications in Anugul since January 2022 are in the same category (Industry): 11 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.7 acres, this one is smaller than 76% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nuata, Banarpal, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) Sub-critical Captive… — returned to applicant, 3.8 km away
- Proposed Industrial Building having total built up area 28662.77 Sqm over… — environmental approval granted, 4.3 km away
- Name change in EC for expansion of existing (2X150) 300 MW TPP by installation… — environmental approval granted, 4.5 km away
- Expansion of 5.6 Mtpa Steel Plant Through Change in Product Mix by… — environmental approval granted, 5.1 km away
- Expansion of Integrated Steel Plant from 5.6 MTPA Crude Steel to 7.1 MTPA… — lapsed, 5.3 km away
- Transfer of Environment Clearance titled "Expansion of Integrated Steel Plant… — lapsed, 5.7 km away
- Transfer of Environment Clearance titled "Expansion of Integrated Steel Plant… — lapsed, 5.7 km away
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) to 2,280 MW (Addition… — under environmental review, 6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.