Quick answers
What is this project?
Proposed Industrial Building having total built up area 28662.77 Sqm over total plot area 30 Acres for production of Lead Acid Batteries in form of Power Storage and Solar Batteries of quantity 8,40,000 Number/Annum at IDCO Aluminium Park, Mouza-Tulasipal, Tehsil – Banarpal, District -Angul, Odisha by Luminous Power Technologies Private Limited is an approved industrial building project in Banda, Banarpal, Anugul, Odisha. The site covers 30 acres.
Who is building it?
The applicant is Luminous Power Technologies Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Jan 2026), as of 27 Nov 2026.
Where is it?
In Banda, Banarpal, Anugul, Odisha.
How big is it?
It has a stated cost of ₹303 crore and a site of 30 acres.
When was it filed?
The application was filed on 4 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Jan 2026 |
| Application filed | 4 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Luminous Power Technologies Private Limited |
| Use | Industrial |
| Land area | 30 acres (12.1 ha) |
| Built-up area | 28,663 m² (3,08,526 sq ft) |
| Plot area | 1,21,405 m² (13,06,791 sq ft) |
| Project cost | ₹303 crore |
| Village / locality | Banda |
| Taluk / tehsil | Banarpal |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02386 |
In context
19 applications in Anugul since January 2022 are in the same category (Buildings & townships): 3 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. At 30 acres, this one is larger than 78% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Banda, Banarpal, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Aluminium Smelter Plant production capacity from 4.6 LTPA to 9.57… — lapsed, 3.1 km away
- Expansion of Aluminium Smelter Plant production capacity from 4.6 LTPA to 9.57… — cleared for impact study, 3.1 km away
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) Sub-critical Captive… — returned to applicant, 3.4 km away
- Environmental Clearance for Production of country Liquor from the… — environmental approval granted, 4.3 km away
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) to 2,280 MW (Addition… — under environmental review, 4.8 km away
- Name change in EC for expansion of existing (2X150) 300 MW TPP by installation… — environmental approval granted, 7.4 km away
- Expansion of 5.6 Mtpa Steel Plant Through Change in Product Mix by… — environmental approval granted, 7.6 km away
- Expansion of Integrated Steel Plant from 5.6 MTPA Crude Steel to 7.1 MTPA… — lapsed, 7.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.