Project details
| Official title | Proposed Greenfield Project for Installation of 3 x 12 Tonne/ Heat SMS for production of 1,04,000 TPA Billets, Rolling Mill for Production of 1,00,700 TPA Rolled Products and Tube Mill for the production of 98,725 TPA MS Round, SHS (Square Hollow Section), and RHS (Rectangular Hollow Section) pipes and tubes by M/s Sri Trinetra Iron and Steels Pvt. Ltd. located at Village San- Brahmanitarang, Tehsil – Lathikata, District – Sundargarh, Odisha |
|---|---|
| Status | Not approved |
| Status since | 4 Aug 2025 |
| Application filed | 22 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Sri Trinetra Iron and Steels Private Limited |
| Land area | 5 acres (2 ha) |
| Project cost | ₹42 crore |
| Village / locality | Brahmanataranga |
| Taluk / tehsil | Brahmani Tarang |
| District | Sundargarh |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00861 |
In context
57 applications in Sundargarh since January 2022 are in the same category (Industry): 17 approved, 18 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5 acres, this one is smaller than 70% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Brahmanataranga, Brahmani Tarang, Sundargarh, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing Sponge iron 91,520 TPA to proposed final capacity of… — lapsed, 400 m away
- Diversion of 9.548 Ha of forest area proposed for diversion for the Project… — under forest review, 400 m away
- Transfer of Environment Clearance letter issued by Ministry of Environment,… — lapsed, 500 m away
- Expansion of existing Sponge iron 1,00,000 TPA to proposed final capacity of… — lapsed, 550 m away
- Regularization of existing rolling mill for the production of Rerolled steel… — lapsed, 700 m away
- Enhancement of production capacity of existing Induction Furnace from 0.2 MTPA… — initial checks, 1.2 km away
- Proposed for capacity enhancement of DRI Plant from 2x500 TPD to 2x650 TPD… — initial checks, 1.2 km away
- Expansion of DRI Plant from 0.552 MTPA to 0.783 MTPA, SMS Plant from 0.318… — lapsed, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.