Quick answers
What is this project?
Forest Diversion Proposal over 20.950Ac./8.478Ha. Forest Land for the construction of Rehabilitation and Resettlement (R&R) colony for Project Displaced Families (PDFs) of Talabira NLC Thermal Power Project (NTTPP) in fovour of NLC India Limited is a proposed building project in Hirama, Badmal, Jharsuguda, Odisha. The site covers 21 acres.
Who is building it?
The applicant is Nlc India Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Hirama, Badmal, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹636.5 crore; a site of 21 acres and 20.9 acres (8.5 ha) of forest land.
When was it filed?
The application was filed on 16 Oct 2026.
Project details
| Official title | Forest Diversion Proposal over 20.950Ac./8.478Ha. Forest Land for the construction of Rehabilitation and Resettlement (R&R) colony for Project Displaced Families (PDFs) of Talabira NLC Thermal Power Project (NTTPP) in fovour of NLC India Limited at Village- Hirma, Tahasil – Jharsuguda under Jharsuguda Forest Division in Jharsuguda District. |
|---|---|
| Status | Under forest review |
| Status since | 13 Nov 2026 |
| Application filed | 16 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Nlc India Limited |
| Land area | 21 acres (8.5 ha) |
| Forest land | 20.9 acres (8.5 ha) |
| Project cost | ₹636.5 crore |
| Village / locality | Hirama |
| Taluk / tehsil | Badmal |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04122 |
In context
11 applications in Jharsuguda since January 2022 are in the same category (Buildings & townships): 1 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. At 21 acres, this one is smaller than 91% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hirama, Badmal, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (5.4 km away).
Other projects nearby
- Iron Ore Pellet Plant of production capacity of 2 X 0.6 MTPA by Konark Ispat… — cleared for impact study, 850 m away
- Proposed Integrated Steel Plant of 0.528 MTPA Crude Steel in 103.581 Ha — cleared for impact study, 1.2 km away
- Manufacturing of Direct Drawn High Carbon Spring Wire 1.40 Mm to 2.20 Mm,… — cleared for impact study, 1.6 km away
- Provision of Fly Over — more information requested, 2.7 km away
- 1X800MW NLC Talabira Thermal Power Project (NTTPP) Phase-II — cleared for impact study, 3.4 km away
- Extension of Existing Township (Built-up Area from 3,16,464.3 sqm to… — not approved, 3.5 km away
- Expansion of existing 60,000 TPA of Sponge Iron from DRI Kiln to Proposed… — lapsed, 4 km away
- Expansion of Integrated Steel Plant (from 0.5 MTPA to 7.65 MTPA Finished… — initial checks, 4.4 km away
More from Nlc India Limited in Jharsuguda
- Talabira II & III Opencast Coal Mine — environmental approval granted
- Talabira II & III Open Cast Mine — returned to applicant
- 1X800MW NLC Talabira Thermal Power Project (NTTPP) Phase-II — cleared for impact study
4 Nlc India projects in Jharsuguda