Diversion of forest land for Construction of 220KV LILO line from Existing LOC NO- 30 of Rengali-NALCO D/C line near Village Jagannathpur to New Talcher Fertilizers Limited(TFL) Grid Station is a proposed power project in Diajharan, Bikrampur, Anugul, Odisha. The site covers 69.1 acres.
Who is building it?
The applicant is E.H.T. (C) Division Optcl Anugul.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Diajharan, Bikrampur, Anugul, Odisha.
How big is it?
It has a stated cost of ₹54 crore; a site of 69.1 acres and 4.1 acres (1.7 ha) of forest land.
When was it filed?
The application was filed on 26 Oct 2026.
Project details
| Official title | Diversion of forest land for Construction of 220KV LILO line from Existing LOC NO- 30 of Rengali-NALCO D/C line near Village Jagannathpur to New Talcher Fertilizers Limited(TFL) Grid Station at Village Tentuli for M/S OPTCL in Angul District, Odisha |
|---|---|
| Status | Initial checks |
| Status since | 27 Oct 2026 |
| Application filed | 26 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | E.H.T. (C) Division Optcl Anugul |
| Land area | 69.1 acres (28 ha) |
| Forest land | 4.1 acres (1.7 ha) |
| Project cost | ₹54 crore |
| Village / locality | Diajharan |
| Taluk / tehsil | Bikrampur |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04192 |
In context
17 applications in Anugul since January 2022 are in the same category (Power): 7 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 69.1 acres, this one is smaller than 94% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Diajharan, Bikrampur, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2x660 MW (Stage-III, Expansion) Coal based Ultra Super Critical Talcher… — environmental approval granted, 4.7 km away
- Jagannath OCP Expansion — lapsed, 5.4 km away
- Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III:… — under environmental review, 5.6 km away
- Proposed Expansion of the Existing 1,200 MW (10x120 MW) to 2,280 MW (Addition… — under environmental review, 6.1 km away
- Dhobapal Sand Quarry over an area of 18.00 acres or 7.28 Hectares bearing… — not approved, 6.3 km away
- Bhubaneswari Expansion Ocp 50 Mty — under forest review, 6.5 km away
- Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand… — environmental approval granted, 6.5 km away
- Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand… — not approved, 6.5 km away
More from E.H.T. (C) Division Optcl Anugul in Anugul
- The proposed 132 kV LILO transmission line from 132 kV Boudh - Kiakata DC line… — forest land use approved