Quick answers
What is this project?
Extension of Existing Township (Built-up Area from 3,16,464.3 sqm to 3,57,144.3 sqm) of Vedanta Limited, Aluminium and Power, Village- Bhurkamunda, PO Sripura, District Jharsuguda, Odisha by M/s Vedanta Limited under TPP (EC of 2007) is a rejected township project in Jh>Rsuguda Town, Jharsuguda, Odisha. It plans 2,349 units of up to 10 floors on 98.5 acres.
Who is building it?
The applicant is Vedanta Limited.
Has it been approved?
No. The application was rejected on 8 Jan 2026.
Where is it?
In Jh>Rsuguda Town, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹498 crore and a site of 98.5 acres.
When was it filed?
The application was filed on 7 Jun 2025.
Project details
| Status | Not approved |
|---|---|
| Status since | 8 Jan 2026 |
| Application filed | 7 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Vedanta Limited |
| Use | Township |
| Units | 2,349 |
| Floors (tallest) | 10 |
| Land area | 98.5 acres (39.9 ha) |
| Built-up area | 3,16,464 m² (34,06,387 sq ft) |
| Plot area | 3,98,696 m² (42,91,524 sq ft) |
| Project cost | ₹498 crore |
| Village / locality | Jh>Rsuguda Town |
| Taluk / tehsil | Jharsuguda |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02248 |
In context
11 applications in Jharsuguda since January 2022 are in the same category (Buildings & townships): 1 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. At 98.5 acres, this one is smaller than 64% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jh>Rsuguda Town, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (8.8 km away).
Other projects nearby
- For Electrical Installation & Switch Yard for 2400 MW of Thermal Power Plant… — lapsed, 1.6 km away
- Manufacturing of Direct Drawn High Carbon Spring Wire 1.40 Mm to 2.20 Mm,… — cleared for impact study, 2.8 km away
- Forest Diversion Proposal over 20.950Ac./8.478Ha. Forest Land for the… — under forest review, 3.5 km away
- Expansion of Aluminium Smelter Production Capacity from 16 LTPA to 18 LTPA,… — lapsed, 4.1 km away
- Transfer of EC of Sripura Sand Bed-B over an area 12.00 Acres or 4.86 Ha — environmental approval granted, 4.1 km away
- Proposed Expansion of an Industrial Building With a Total Built-Up Area… — more information requested, 4.2 km away
- Sripura Sand Bed-B — not approved, 4.3 km away
- Iron Ore Pellet Plant of production capacity of 2 X 0.6 MTPA by Konark Ispat… — cleared for impact study, 4.4 km away
More from Vedanta Limited in Jharsuguda
- Proposed Capacity Enhancement of Aluminium Smelter From 18.5 Ltpa to 20.0 Ltpa… — initial checks
- Proposed Capacity Enhancement of Aluminium Smelter From 18.0 Ltpa to 18.5 Ltpa… — initial checks
- For Electrical Installation & Switch Yard for 2400 MW of Thermal Power Plant… — lapsed
- Expansion of Aluminium Smelter Production Capacity from 16 LTPA to 18 LTPA,… — lapsed
- Expansion of Aluminium Smelter Production Capacity from 16 LTPA to 18 LTPA,… — lapsed
- Proposed "WORLD CLASS ALUMINIUM PARK OF VEDANTA" (Special Purpose Vehicle of… — environmental approval granted
7 Vedanta Limited(Division Cairn projects in Jharsuguda
All 76 Vedanta Limited(Division Cairn projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.