Quick answers
What is this project?
Proposed Talcher-III to Pandiabili (ISTS) 400 kV D/c (Twin Moose) dedicated transmission line by NTPC is a proposed power project in Basanta, Khordha, Odisha. The site covers 1,488.9 acres.
Who is building it?
The applicant is NTPC Limited (NTPC).
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Basanta, Khordha, Odisha.
How big is it?
It has a stated cost of ₹520 crore; a site of 1,488.9 acres and 86.3 acres (34.9 ha) of forest land.
When was it filed?
The application was filed on 24 Nov 2026.
Project details
| Official title | Construction of proposed Talcher-III to Pandiabili (ISTS) 400 kV D/c (Twin Moose) dedicated transmission line |
|---|---|
| Status | Under forest review |
| Status since | 24 Nov 2026 |
| Application filed | 24 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | NTPC Limited (NTPC) |
| Land area | 1,488.9 acres (602.5 ha) |
| Forest land | 86.3 acres (34.9 ha) |
| Project cost | ₹520 crore |
| Village / locality | Basanta |
| Taluk / tehsil | Khordha |
| District | Khordha |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04964 |
Where it is
Basanta, Khordha, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New 6-lane Capital Region Ring Road (CRRR-I) from Rameswar (NH-16) to… — cleared for impact study, 20.8 km away
- Satellite Based Land Surface Temperature Anomalies Thermal Hot Spots… — lapsed, 26.4 km away
- Proposed Industrial Building having total built up area 1,20,397.81 sqm over… — returned to applicant, 27.8 km away
- Proposed Industrial Building having total built up area 1,20,397.81 sqm over… — returned to applicant, 27.8 km away
- New Six-lane Capital Region Ring Road from Rameswar (NH-16) to Gobindpur… — lapsed, 30.6 km away
- Greenfield Ferro alloys Plant for production of 52400TPA(Max) Ferro Alloys… — environmental approval granted, 32.9 km away
- Greenfield Ferro alloys Plant for production of 52400TPA(Max) Ferro Alloys… — cleared for impact study, 32.9 km away
- Merger of New Laxmi Steel & Power Pvt. Ltd. & New Laxmi Industry Pvt. Ltd.,… — more information requested, 33.1 km away
All 129 NTPC projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.