Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 May 2025 |
| Application filed | 7 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Telangana State Power Generation Corporation Limited |
| Use | Mixed use |
| Units | 2,070 |
| Towers | 32 |
| Floors (tallest) | 11 |
| Land area | 54.8 acres (22.2 ha) |
| Built-up area | 3,62,643 m² (39,03,453 sq ft) |
| Plot area | 2,21,900 m² (23,88,509 sq ft) |
| Project cost | ₹1,215 crore |
| Village / locality | Veerla Palem |
| Taluk / tehsil | Dameracherla |
| District | Nalgonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02782 |
In context
7 applications in Nalgonda since January 2022 are in the same category (Buildings & townships): 4 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Veerla Palem, Dameracherla, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 600 KLD Grain-Based Distillery Plant producing 600 KLD Ethanol or 400 KLD… — cleared for impact study, 2.6 km away
- 4000 MW Yadadri Thermal Power Station (5 X 800 MW Supercritical Coal Based… — environmental approval granted, 2.7 km away
- Proposed Mosaic Chips Quarry of Sri Gade Adinarayana Reddy — environmental approval granted, 3.7 km away
- Proposed Mosaic Chips Quarry of Sri Gade Padma — environmental approval granted, 3.7 km away
- Greenfield 1 x 200 KLPD Grain based Ethanol Plant with 1 x 4.8 MW Cogeneration… — environmental approval granted, 3.7 km away
- Sentini Bio Spirit Water Pipeline — lapsed, 4.6 km away
- Sri Nakka Hari Babu — environmental approval granted, 7.1 km away
- Mining project by M/s Raghavendra Mines & Minerals — environmental approval granted, 8.3 km away
More from Telangana State Power Generation Corporation Limited in Nalgonda
- 4000 MW Yadadri Thermal Power Station (5 X 800 MW Supercritical Coal Based… — environmental approval granted
All 3 Telangana State Power Generation Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.