Project details
| Official title | Establishment of a 600 KLD Grain-Based Distillery Plant producing 600 KLD Ethanol or 400 KLD Ethanol + 200 KLD Extra Neutral Alcohol along with 15 MW Co-generation Power Plant by M/s. Soham Agro Industries Private Limited. |
|---|---|
| Status | Cleared for impact study |
| Status since | 8 Jun 2026 |
| Application filed | 2 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Soham Agro Industries Private Limited |
| Land area | 108.3 acres (43.8 ha) |
| Project cost | ₹750 crore |
| Village / locality | Veerla Palem |
| Taluk / tehsil | Dameracherla |
| District | Nalgonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-03330 |
In context
23 applications in Nalgonda since January 2022 are in the same category (Industry): 16 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 108.3 acres, this one is larger than 78% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Veerla Palem, Dameracherla, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Mosaic Chips Quarry of Sri Gade Adinarayana Reddy — environmental approval granted, 1.2 km away
- Proposed Mosaic Chips Quarry of Sri Gade Padma — environmental approval granted, 1.4 km away
- Greenfield 1 x 200 KLPD Grain based Ethanol Plant with 1 x 4.8 MW Cogeneration… — environmental approval granted, 1.6 km away
- Telangana State Power Generation Corporation Limited (TGGENCO) - Construction… — environmental approval granted, 2.6 km away
- Sentini Bio Spirit Water Pipeline — lapsed, 2.8 km away
- 4000 MW Yadadri Thermal Power Station (5 X 800 MW Supercritical Coal Based… — environmental approval granted, 3 km away
- Sri Nakka Hari Babu — environmental approval granted, 8.8 km away
- Proposed Integrated Ferro Alloy & Steel complex including 2 x 65 MW captive… — environmental approval granted, 9.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.