What is Developing? Open the mapMap

Cleared for impact studyIndustry · Thiruvallur, Tamil Nadu

Expansion in cement production capacity of Standalone Grinding Unit from EC granted capacity of 0.9 million TPA to 6.0 million TPA by installation of Roller Press in existing cement mill (Phase-I : 0.9 to 3.0 million TPA) & installation of additional Cement Mill (Phase-II : 3.0 million TPA)

Expansion in cement production capacity of Standalone Grinding Unit from EC granted capacity of 0.9 million TPA to 6.0 million TPA by installation of Roller Press in existing cement mill (Phase-I : 0.9 to 3.0 million TPA) & installation of additional Cement Mill (Phase-II : 3.0 million TPA) is a proposed industrial project in Vallur, Ponneri, Thiruvallur, Tamil Nadu. The site covers 66.1 acres. Its stated project cost is ₹692.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Mar 2025).

See it on the live map All projects in Thiruvallur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleExpansion in cement production capacity of Standalone Grinding Unit from EC granted capacity of 0.9 million TPA to 6.0 million TPA by installation of Roller Press in existing cement mill (Phase-I : 0.9 to 3.0 million TPA) & installation of additional Cement Mill (Phase-II : 3.0 million TPA) at Village Vallur, Taluk Ponneri, District Thiruvallur (Tamil Nadu) by The India Cements Limited (A subsidiary of UltraTech Cement Limited)
StatusCleared for impact study
Status since5 Mar 2025
Application filed5 Feb 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantThe India Cements Limited
Land area66.1 acres (26.7 ha)
Project cost₹692.5 crore
Village / localityVallur
Taluk / tehsilPonneri
DistrictThiruvallur
StateTamil Nadu
Location fromSite boundary on record
Our referenceWID-TN-03421

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 3 Jul 2025Lapsed66.1 acres₹692.5 crore
Early planning filed 5 Feb 2025 (this page)Cleared for impact study66.1 acres₹692.5 crore

In context

56 applications in Thiruvallur since January 2022 are in the same category (Industry): 32 approved, 19 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 66.1 acres, this one is larger than 84% of them.

12 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vallur, Ponneri, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Kattupalli Port Expansion: A ₹2,566-Crore Upgrade for Thiruvallur, Tamil Nadu (9.3 km away).

Other projects nearby

All 26 The India Cements projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.