Project details
| Official title | Expansion in cement production capacity of Standalone Grinding Unit from EC granted capacity of 0.9 million TPA to 6.0 million TPA by installation of Roller Press in existing cement mill (Phase-I : 0.9 to 3.0 million TPA) & installation of additional Cement Mill (Phase-II : 3.0 million TPA) at Village Vallur, Taluk Ponneri, District Thiruvallur (Tamil Nadu) by The India Cements Limited (A subsidiary of UltraTech Cement Limited) |
|---|---|
| Status | Cleared for impact study |
| Status since | 5 Mar 2025 |
| Application filed | 5 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | The India Cements Limited |
| Land area | 66.1 acres (26.7 ha) |
| Project cost | ₹692.5 crore |
| Village / locality | Vallur |
| Taluk / tehsil | Ponneri |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03421 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 3 Jul 2025 | Lapsed | 66.1 acres | ₹692.5 crore |
| Early planning filed 5 Feb 2025 (this page) | Cleared for impact study | 66.1 acres | ₹692.5 crore |
In context
56 applications in Thiruvallur since January 2022 are in the same category (Industry): 32 approved, 19 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 66.1 acres, this one is larger than 84% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vallur, Ponneri, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Kattupalli Port Expansion: A ₹2,566-Crore Upgrade for Thiruvallur, Tamil Nadu (9.3 km away).
Other projects nearby
- Expansion in cement production capacity of Standalone Grinding Unit from EC… — lapsed, 0 m away
- 'NIPL' Certification for Proposed Modification & Process Optimisation for… — initial checks, 50 m away
- Laying of Product Operating Line (POL) Pipeline from Kamarajar Port at Ennore… — coastal clearance granted, 1.8 km away
- Laying of new 28" Desal Water Pipeline & 10" Reject Water Pipeline between… — under coastal review, 2.2 km away
- Standalone Cement Grinding Unit with Cement (OPC & PPC) Production Capacity of… — cleared for impact study, 2.4 km away
- Standalone Cement Grinding Unit with Cement (OPC & PPC) Production Capacity of… — cleared for impact study, 2.4 km away
- 1x 800 MW NCTPP Stage III by M/s. TNPGCL (Erstwhile TANGEDCO) — lapsed, 3 km away
- Amendment of Environmental Clearance for 1X800 MW (Stage-III), North Chennai… — environmental approval granted, 3 km away
All 26 The India Cements projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.