Quick answers
What is Proposed 60 KLPD Grain Based Distillery?
Proposed 60 KLPD Grain Based Distillery is an approved industrial project in Kuri, Laksar, Hardwar, Uttarakhand. The site covers 7.2 acres.
Who is building it?
The applicant is Athley Petrochems Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Oct 2022), as of 27 Nov 2026.
Where is it?
In Kuri, Laksar, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹100 crore and a site of 7.2 acres.
When was it filed?
The application was filed on 19 Oct 2022.
Project details
| Official title | Proposed 60 KLPD Grain Based Distillery along with 2.13 MW Co-gen under Ethanol Blending Program by M/s Athley Petrochem Pvt. Ltd. at Survey No. 145, 146M,150M, Village-Mundakheda Khurd, Taluka Laksar, District Haridwar, Uttarakhand |
|---|---|
| Status | Environmental approval granted |
| Status since | 19 Oct 2022 |
| Application filed | 19 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Athley Petrochems Private Limited |
| Land area | 7.2 acres (2.9 ha) |
| Project cost | ₹100 crore |
| Village / locality | Kuri |
| Taluk / tehsil | Laksar |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00023 |
In context
22 applications in Hardwar since January 2022 are in the same category (Industry): 17 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 7.2 acres, this one is smaller than 68% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kuri, Laksar, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 7.5 MW co-generation thermal power plant at Khedi Mubarakpur, Tehsil Laksar,… — under environmental review, 4.4 km away
- Extraction of Sand, Bajri, and Boulder (Construction of a Pond for Fish Farming) — environmental approval granted, 8.3 km away
- Sand, Bajri & Boulder Mine for the Construction of a Pond for Fish Farming… — environmental approval granted, 10 km away
- Sand, Bajri & Boulder Mine for the Construction of a Pond for Fish Farming Kh.… — returned to applicant, 10 km away
- Muzaffarpur Gujra Sand, Bajri & Boulder (Water Storage Tank) Mining Project — initial checks, 10.3 km away
- Environmental Clearance for Proposed RBM mining project by M/s Surya Stone… — environmental approval granted, 10.9 km away
- Environmental Clearance for Proposed Rbm Mining Project by Shri Ganesh Stone… — environmental approval granted, 12.3 km away
- Rampur Raighatі Aht Sand Bajri Boulder (RBM) Mining Project — initial checks, 13.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.