Environmental approval grantedIndustry · Udham Singh Nagar, Uttarakhand

Environmental Clearance for Production of Resin Derivatives in Existing MDF/EDHMR/PRELAM Manufacturing Unit by M/s Archidpanel Industries Private Limited

Environmental Clearance for Production of Resin Derivatives in Existing MDF/EDHMR/PRELAM Manufacturing Unit by M/s Archidpanel Industries Private Limited is an approved industrial project in Bara, Sitarganj, Udham Singh Nagar, Uttarakhand. The site covers 25 acres. Its stated project cost is ₹350 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 3 Sept 2024).

See it on the live map All projects in Udham Singh Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for Production of Resin Derivatives in Existing MDF/EDHMR/PRELAM Manufacturing Unit by M/s Archidpanel Industries Private Limited is an approved industrial project in Bara, Sitarganj, Udham Singh Nagar, Uttarakhand. The site covers 25 acres.

Who is building it?

The applicant is archidpanel Industries Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 3 Sept 2024), as of 27 Nov 2026.

Where is it?

In Bara, Sitarganj, Udham Singh Nagar, Uttarakhand.

How big is it?

It has a stated cost of ₹350 crore and a site of 25 acres.

When was it filed?

The application was filed on 3 Aug 2024.

Project details

StatusEnvironmental approval granted
Status since3 Sept 2024
Application filed3 Aug 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
Applicantarchidpanel Industries Private Limited
Land area25 acres (10.1 ha)
Project cost₹350 crore
Village / localityBara
Taluk / tehsilSitarganj
DistrictUdham Singh Nagar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00297

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 3 Aug 2024 (this page)Environmental approval granted25 acres₹350 crore
New project filed 29 Jul 2024Withdrawn25 acres₹350 crore

In context

50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 25 acres, this one is larger than 70% of them.

32 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bara, Sitarganj, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.