Quick answers
What is this project?
Environmental Clearance for Production of Resin Derivatives in Existing MDF/EDHMR/PRELAM Manufacturing Unit by M/s Archidpanel Industries Private Limited is a withdrawn industrial project in Bara, Sitarganj, Udham Singh Nagar, Uttarakhand. The site covers 25 acres.
Who is building it?
The applicant is archidpanel Industries Private Limited.
Has it been approved?
No. The application was withdrawn on 5 Aug 2024, so it is no longer under consideration.
Where is it?
In Bara, Sitarganj, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹350 crore and a site of 25 acres.
When was it filed?
The application was filed on 29 Jul 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Production of Resin Derivatives in Existing MDF/EDHMR/PRELAM…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 5 Aug 2024 |
| Application filed | 29 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | archidpanel Industries Private Limited |
| Land area | 25 acres (10.1 ha) |
| Project cost | ₹350 crore |
| Village / locality | Bara |
| Taluk / tehsil | Sitarganj |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00307 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Aug 2024 | Environmental approval granted | 25 acres | ₹350 crore |
| New project filed 29 Jul 2024 (this page) | Withdrawn | 25 acres | ₹350 crore |
In context
50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 25 acres, this one is larger than 70% of them.
32 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bara, Sitarganj, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Production of Resin Derivatives in Existing… — environmental approval granted, 0 m away
- Proposed 20 TPD Hazardous Waste Incinerator Facility (Standalone incinerator)… — cleared for impact study, 600 m away
- Environmental Clearance for Proposed Expansion of Existing Water Based… — environmental approval granted, 750 m away
- 25 MW Captive Co-generation Power Plant at Sitarganj, District Udham Singh… — more information requested, 1.3 km away
- Integrated Industrial Estate (IIE) Sitarganj Part II (B) — environmental approval granted, 1.7 km away
- Affordable housing project under violation by M/s Grip Construction Pvt. Ltd. — environmental approval granted, 1.9 km away
- Affordable housing project under violation by M/s Grip Construction Pvt. Ltd. — cleared for impact study, 1.9 km away
- Ukrauli Sand, Bajri and Boulders (RBM) Mining in Kailash River at Khasra No.… — initial checks, 2.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.