Quick answers
What is Proposed Kyotara Sand/Morrum Mining Project on Betwa River?
Proposed Kyotara Sand/Morrum Mining Project on Betwa River is an approved mining project in Kyotra, Kalpi, Jalaun, Uttar Pradesh. The site covers 45 acres.
Who is building it?
The applicant is M/S Mk Mines and Minerals.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 31 Jan 2023), as of 27 Nov 2026.
Where is it?
In Kyotra, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹8.2 crore and a site of 45 acres.
When was it filed?
The application was filed on 31 Jan 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 31 Jan 2023 |
| Application filed | 31 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S Mk Mines and Minerals |
| Land area | 45 acres (18.2 ha) |
| Project cost | ₹8.2 crore |
| Village / locality | Kyotra |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00128 |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 45 acres, this one is larger than 62% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 185.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.
Where it is
Kyotra, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — more information requested, 400 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — more information requested, 400 m away
- Riverbed Sand/ Morrum Mining from Betwa River — environmental approval granted, 450 m away
- Riverbed Sand/ Morrum Mining from Betwa River — cleared for impact study, 450 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 850 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 850 m away
- Proposed Project of "Sand/Morrum Mining" at Gata No. 240 (Khand No. 04),… — environmental approval granted, 1.2 km away
- Proposed Project of "Sand/Morrum Mining" at Gata No. 240 (Khand No. 04),… — cleared for impact study, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.