Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Kyotra, Kalpi, Jalaun, Uttar Pradesh. The site covers 50 acres.
Who is building it?
The applicant is Sajida Begum.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kyotra, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹10.6 crore and a site of 50 acres.
When was it filed?
The application was filed on 17 Apr 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Betwa River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village- Kyotara, Gata No.- 267, 268, Khand No. - 01, Lease Area- 20.242 ha., Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, (Project Proponent- Sajida Begum W/o Shamim Ahmad) |
|---|---|
| Status | More information requested |
| Status since | 1 Sept 2026 |
| Application filed | 17 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sajida Begum |
| Land area | 50 acres (20.2 ha) |
| Project cost | ₹10.6 crore |
| Village / locality | Kyotra |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03481 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 28 Oct 2026 | More information requested | 50 acres | ₹10.4 crore |
| Early planning filed 17 Apr 2025 (this page) | More information requested | 50 acres | ₹10.6 crore |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 130.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Kyotra, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — more information requested, 0 m away
- Proposed Kyotara Sand/Morrum Mining Project on Betwa River — environmental approval granted, 400 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 400 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 400 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — more information requested, 800 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 800 m away
- Riverbed Sand/ Morrum Mining from Betwa River — environmental approval granted, 850 m away
- Riverbed Sand/ Morrum Mining from Betwa River — cleared for impact study, 850 m away
About this information