What is Developing? Open the mapMap

More information requestedMining · Jalaun, Uttar Pradesh

"Sand/Morrum Mining" from Riverbed of Betwa River

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Kyotra, Kalpi, Jalaun, Uttar Pradesh. The site covers 50 acres. Its stated project cost is ₹10.6 crore. As of 27 Nov 2026, its status is “More information requested” (since 1 Sept 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mining" from Riverbed of Betwa River?

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Kyotra, Kalpi, Jalaun, Uttar Pradesh. The site covers 50 acres.

Who is building it?

The applicant is Sajida Begum.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Kyotra, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹10.6 crore and a site of 50 acres.

When was it filed?

The application was filed on 17 Apr 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Betwa River

Project details

Official title"Sand/Morrum Mining" from Riverbed of Betwa River at Village- Kyotara, Gata No.- 267, 268, Khand No. - 01, Lease Area- 20.242 ha., Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, (Project Proponent- Sajida Begum W/o Shamim Ahmad)
StatusMore information requested
Status since1 Sept 2026
Application filed17 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSajida Begum
Land area50 acres (20.2 ha)
Project cost₹10.6 crore
Village / localityKyotra
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03481

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 28 Oct 2026More information requested50 acres₹10.4 crore
Early planning filed 17 Apr 2025 (this page)More information requested50 acres₹10.6 crore

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 130.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.

Where it is

Kyotra, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.