Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Chirpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 35 acres.
Who is building it?
The applicant is K M Cars Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Sept 2024), as of 27 Nov 2026.
Where is it?
In Chirpura, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹95 lakh and a site of 35 acres.
When was it filed?
The application was filed on 6 Jun 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Betwa River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village- Chirpura, Gata No.- 104, Khand No.- 02, Lease Area- 14.170 ha., Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, Project Proponent- M/s K M Cars Private Limited (Director- Shri Ajay Pal Singh Parmar) |
|---|---|
| Status | Cleared for impact study |
| Status since | 11 Sept 2024 |
| Application filed | 6 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | K M Cars Private Limited |
| Land area | 35 acres (14.2 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Chirpura |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02541 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Nov 2024 | Environmental approval granted | 35 acres | ₹95 lakh |
| Early planning filed 6 Jun 2024 (this page) | Cleared for impact study | 35 acres | ₹95 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 35 acres, this one is smaller than 68% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 170.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.
Where it is
Chirpura, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 0 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — more information requested, 350 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 350 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — more information requested, 400 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — more information requested, 400 m away
- Proposed Kyotara Sand/Morrum Mining Project on Betwa River — environmental approval granted, 850 m away
- Sand/Morrum Mining Project — environmental approval granted, 900 m away
- Sand/Morrum Mining Project — cleared for impact study, 950 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.