What is Developing? Open the mapMap

Cleared for impact studyMining · Jalaun, Uttar Pradesh

"Sand/Morrum Mining" from Riverbed of Betwa River

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Chirpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 35 acres. Its stated project cost is ₹95 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 11 Sept 2024).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mining" from Riverbed of Betwa River?

"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Chirpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 35 acres.

Who is building it?

The applicant is K M Cars Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 11 Sept 2024), as of 27 Nov 2026.

Where is it?

In Chirpura, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹95 lakh and a site of 35 acres.

When was it filed?

The application was filed on 6 Jun 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Betwa River

Project details

Official title"Sand/Morrum Mining" from Riverbed of Betwa River at Village- Chirpura, Gata No.- 104, Khand No.- 02, Lease Area- 14.170 ha., Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, Project Proponent- M/s K M Cars Private Limited (Director- Shri Ajay Pal Singh Parmar)
StatusCleared for impact study
Status since11 Sept 2024
Application filed6 Jun 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantK M Cars Private Limited
Land area35 acres (14.2 ha)
Project cost₹95 lakh
Village / localityChirpura
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02541

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 18 Nov 2024Environmental approval granted35 acres₹95 lakh
Early planning filed 6 Jun 2024 (this page)Cleared for impact study35 acres₹95 lakh

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 35 acres, this one is smaller than 68% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 170.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.

Where it is

Chirpura, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.