Quick answers
What is this project?
Protected Forest Land proposed for diversion for Entry/Exit approach to Indian Oil Corporation Limited Retail Outlet on NH-27 (Old NH-28) in Km. 1451-1453 (Ch. 1451.935 RHS) at Gata No. 974, Village: Amrokh, Tehsil-Moth, District: Jhansi (Uttar Pradesh) is a lapsed fuel station in Amraukh, Moth, Jhansi, Uttar Pradesh. The site covers 5.7 acres.
Who is building it?
The applicant is Hemant Kumar.
Has it been approved?
No. The application was lapsed on 1 Dec 2023, so it is no longer under consideration.
Where is it?
In Amraukh, Moth, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh; a site of 5.7 acres and 1,660 m² of forest land.
When was it filed?
The application was filed on 2 Jan 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Dec 2023 |
| Application filed | 2 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hemant Kumar |
| Land area | 5.7 acres (2.3 ha) |
| Forest land | 1,660 m² |
| Project cost | ₹45 lakh |
| Village / locality | Amraukh |
| Taluk / tehsil | Moth |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07184 |
In context
31 applications in Jhansi since January 2022 are in the same category (Fuel stations): 13 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 5.7 acres, this one is larger than 94% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Amraukh, Moth, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone or Khanda, Gitti, Boulder, Mining Project — lapsed, 2 km away
- Mining project by M/s Buddh Singh Granite — environmental approval granted, 2.1 km away
- Building Stone or Granite, Khanda, Boulder (Gitty) Mining Project — cleared for impact study, 2.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — more information requested, 3.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved, 4.4 km away
- Sand/Morrum Mining from Betwa River Bed mining project — under environmental review, 6.7 km away
- Proposed project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — cleared for impact study, 7.6 km away
- Sand/Morrum Mining from Betwa River Bed Mining Project — cleared for impact study, 8.5 km away
More from Hemant Kumar in Jhansi
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.