Quick answers
What is this project?
Proposed Protected Forest Land to be Diverted for Entry/Exit approach of Indian Oil corporation Ltd Kanpur, retail outlet on Kanpur-Prayagraj Road NH-19 (old NH-02) km-526 chainage-525.240 LHS in khasra no-324 is a lapsed fuel station in Umrauli Kalyanpur, Bindki, Fatehpur, Uttar Pradesh. The site covers 3.1 acres.
Who is building it?
The applicant is Ashutosh srivastava.
Has it been approved?
No. The application was lapsed on 30 Jul 2026, so it is no longer under consideration.
Where is it?
In Umrauli Kalyanpur, Bindki, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹50 lakh; a site of 3.1 acres and 2,820 m² of forest land.
When was it filed?
The application was filed on 17 Jun 2026.
Project details
| Official title | Proposed Protected Forest Land to be Diverted for Entry/Exit approach of Indian Oil corporation Ltd Kanpur, retail outlet on Kanpur-Prayagraj Road NH-19 (old NH-02) km-526 chainage-525.240 LHS in khasra no-324 in village- Umrauli Kalyanpur, Tahsil-Bindki District-Fatehpur in the State of Uttar Pradesh. |
|---|---|
| Status | Lapsed |
| Status since | 30 Jul 2026 |
| Application filed | 17 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Ashutosh srivastava |
| Land area | 3.1 acres (1.3 ha) |
| Forest land | 2,820 m² |
| Project cost | ₹50 lakh |
| Village / locality | Umrauli Kalyanpur |
| Taluk / tehsil | Bindki |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06913 |
In context
50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 3.1 acres, this one is larger than 96% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Umrauli Kalyanpur, Bindki, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested, 0 m away
- Laying of MDPE Gas Pipe Line (125mm) — lapsed, 2.5 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 3 km away
- Ordinary Soil Excavation Project — environmental approval granted, 3.6 km away
- Laying of MDPE Gas Pipe Line (125mm) — lapsed, 4.1 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 5.8 km away
- Proposed Stand-alone Grinding Unit — cleared for impact study, 9.2 km away
- Proposed Stand-alone Grinding Unit with Cement Production Capacity of 5.0… — lapsed, 9.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.