Quick answers
What is this project?
Proposed Grain Based Distillery Capacity – 60 Kld by M/S Shree Vinod Industries and Chemicals Private Limited is an approved industrial project in Pasra, Basti, Uttar Pradesh. The site covers 6.5 acres.
Who is building it?
The applicant is Shree Vinod Industries and Chemicals Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Sept 2023), as of 27 Nov 2026.
Where is it?
In Pasra, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 crore and a site of 6.5 acres.
When was it filed?
The application was filed on 27 Sept 2023.
Project details
| Official title | Establishment of Proposed Grain Based Distillery Capacity – 60 Kld Along With Co Gen Power of 2.0 MW by M/S Shree Vinod Industries and Chemicals Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 Sept 2023 |
| Application filed | 27 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Shree Vinod Industries and Chemicals Private Limited |
| Land area | 6.5 acres (2.6 ha) |
| Project cost | ₹65 crore |
| Village / locality | Pasra |
| Taluk / tehsil | Basti |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00307 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Sept 2023 (this page) | Environmental approval granted | 6.5 acres | ₹65 crore |
| Early planning filed 22 Feb 2023 | Cleared for impact study | 6.5 acres | ₹65 crore |
In context
6 applications in Basti since January 2022 are in the same category (Industry): 6 approved, 0 filed or under review, and 0 withdrawn, lapsed or rejected.
Where it is
Pasra, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Grain Based Distillery Capacity – 60 Kld by M/S Shree Vinod… — cleared for impact study, 0 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — environmental approval granted, 9.3 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — environmental approval granted, 12 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — cleared for impact study, 12 km away
- Capacity Augmentation and Safety measures for the Ayodhya-Gorakhpur Section… — more information requested, 15.9 km away
- Proposed Forest Land to Be Diverted for Construction of Overbridge — more information requested, 16.8 km away
- Basti Ring Road (Phase-I) with 4-lane confurigation design (Design length… — forest land use approved, 21.7 km away
- Proposed project of Riverbed of Ghaghara River Ordinary Sand Mining at Gata… — under environmental review, 25.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.