"Ordinary Sand Mining" from Riverbed of Ghaghra River

"Ordinary Sand Mining" from Riverbed of Ghaghra River is an approved mining project in Mahdwapar Khurd, Basti, Uttar Pradesh. The site covers 24.7 acres. Its stated project cost is ₹97 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Jan 2026).

See it on the live map All projects in Basti

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Ordinary Sand Mining" from Riverbed of Ghaghra River?

"Ordinary Sand Mining" from Riverbed of Ghaghra River is an approved mining project in Mahdwapar Khurd, Basti, Uttar Pradesh. The site covers 24.7 acres.

Who is building it?

The applicant is Santosh Kumar.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 17 Jan 2026), as of 27 Nov 2026.

Where is it?

In Mahdwapar Khurd, Basti, Uttar Pradesh.

How big is it?

It has a stated cost of ₹97 lakh and a site of 24.7 acres.

When was it filed?

The application was filed on 4 Feb 2025.

Project details

Official title"Ordinary Sand Mining" from Riverbed of Ghaghra River at Village- Mahuapaar Khurd, Gata No.- 391क /67, Lease area- 10.00 ha., Tehsil- Basti Sadar, District- Basti, Uttar Pradesh, Project Proponent- M/s Maa Aadi Shakti Enterprises (Prop. - Shri Santosh Kumar)
StatusEnvironmental approval granted
Status since17 Jan 2026
Application filed4 Feb 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSantosh Kumar
Land area24.7 acres (10 ha)
Project cost₹97 lakh
Village / localityMahdwapar Khurd
Taluk / tehsilBasti
DistrictBasti
StateUttar Pradesh
Location fromSite area on record
Our referenceWID-UP-03582

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 4 Feb 2025 (this page)Environmental approval granted24.7 acres₹97 lakh
Early planning filed 29 Jan 2024Cleared for impact study24.7 acres₹97 lakh

In context

18 applications in Basti since January 2022 are in the same category (Mining): 16 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 24.7 acres, this one is larger than 67% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Mahdwapar Khurd, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.