Quick answers
What is Widening and Strengthening of Fatehgarh Gursahayganj Road?
Widening and Strengthening of Fatehgarh Gursahayganj Road is a lapsed road project in Rajipur, Farrukhabad, Uttar Pradesh. It seeks 32.6 acres of forest land.
Who is building it?
The applicant is Provincial Division PWD Fatehgarh.
Has it been approved?
No. The application was lapsed on 1 Mar 2025, so it is no longer under consideration.
Where is it?
In Rajipur, Farrukhabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹68 crore and 32.6 acres (13.2 ha) of forest land.
When was it filed?
The application was filed on 10 Jan 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Mar 2025 |
| Application filed | 10 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Provincial Division PWD Fatehgarh |
| Forest land | 32.6 acres (13.2 ha) |
| Project cost | ₹68 crore |
| Village / locality | Rajipur |
| Taluk / tehsil | Farrukhabad |
| District | Farrukhabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06871 |
In context
6 applications in Farrukhabad since January 2022 are in the same category (Roads & highways): 2 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rajipur, Farrukhabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land To Be Diverted For Entry And Exit To Bharat… — initial checks, 3.7 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to Major… — lapsed, 4.7 km away
- proposed "Ordinary Soil Excavation Project" at Gata No.- 128Mi, 129 (Total… — environmental approval granted, 6.6 km away
- Proposed Protected Forest Land to Be Diverted by Indian Oil Corporation LTD.… — lapsed, 6.9 km away
- Ordinary Soil Excavation Project — more information requested, 7.7 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — forest land use approved, 9.5 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 131 by Shri Virendra Kumar — under environmental review, 10.9 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending, 13.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.