Quick answers
What is this project?
Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 596 Khand No. 01, Area 16.194 ha is a proposed mining project in Basrehi, Kalpi, Jalaun, Uttar Pradesh. The site covers 40 acres.
Who is building it?
The applicant is Balwant Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Dec 2023), as of 27 Nov 2026.
Where is it?
In Basrehi, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.6 crore and a site of 40 acres.
When was it filed?
The application was filed on 23 Dec 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata…
Project details
| Official title | Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Gata No. 596 Khand No. 01, Area 16.194 ha in Village- Basrehi, Tehsil- Kalpi, District- Jalaun, Uttar Pradesh of M/s Parihar Construction Partner. Shri Balwant Singh |
|---|---|
| Status | Cleared for impact study |
| Status since | 23 Dec 2023 |
| Application filed | 23 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Balwant Singh |
| Land area | 40 acres (16.2 ha) |
| Project cost | ₹3.6 crore |
| Village / locality | Basrehi |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00513 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Aug 2024 | Environmental approval granted | 40 acres | ₹3.6 crore |
| Early planning filed 23 Dec 2023 (this page) | Cleared for impact study | 40 acres | ₹3.6 crore |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40 acres, this one is smaller than 53% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 80 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.
Where it is
Basrehi, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 0 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — under environmental review, 150 m away
- Sand/Morrum Mining Project — cleared for impact study, 750 m away
- Sand/Morrum Mining Project — environmental approval granted, 750 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — more information requested, 1.3 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 1.3 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 1.7 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 1.7 km away
More from Balwant Singh in Jalaun
- Bhedi Khurd Sand/Morrum Mining Project on Betwa River — environmental approval granted
- Bhedi Khurd Sand/Morrum Mining Project on Betwa River — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.