Quick answers
What is Sand/Morrum Mining Project?
Sand/Morrum Mining Project is an approved mining project in Basrehi, Kalpi, Jalaun, Uttar Pradesh. The site covers 40 acres.
Who is building it?
The applicant is Rjhm Minerals Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Mar 2026), as of 27 Nov 2026.
Where is it?
In Basrehi, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 40 acres.
When was it filed?
The application was filed on 27 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Mar 2026 |
| Application filed | 27 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rjhm Minerals Private Limited |
| Land area | 40 acres (16.2 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Basrehi |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-03771 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Dec 2025 (this page) | Environmental approval granted | 40 acres | ₹90 lakh |
| Early planning filed 18 Dec 2024 | Cleared for impact study | 40 acres | ₹90 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40 acres, this one is larger than 52% of them.
No other mining lease on record is within 500 m of this site; 19 have applied within 5 km.
Where it is
Basrehi, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining Project — cleared for impact study, 50 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — more information requested, 550 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 550 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — under environmental review, 600 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 750 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 750 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 900 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 900 m away
All 9 Rjhm Minerals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.