Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Chirpura, Kalpi, Jalaun, Uttar Pradesh. The site covers 35 acres.
Who is building it?
The applicant is Khajuraho Motors Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chirpura, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹98 lakh and a site of 35 acres.
When was it filed?
The application was filed on 29 May 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Betwa River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village- Chirpura, Gata No.- 104, Khand No.- 01, Lease Area- 14.170 ha., Tehsil- Kalpi, District- Jalaun, Uttar Pradesh, Project Proponent- M/s Khajuraho Motors Private Limited (Director- Shri Yashpal Singh Parmar) |
|---|---|
| Status | More information requested |
| Status since | 27 Oct 2026 |
| Application filed | 29 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Khajuraho Motors Private Limited |
| Land area | 35 acres (14.2 ha) |
| Project cost | ₹98 lakh |
| Village / locality | Chirpura |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04550 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 May 2026 (this page) | More information requested | 35 acres | ₹98 lakh |
| Early planning filed 4 Jun 2024 | Cleared for impact study | 35 acres | ₹98 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 35 acres, this one is smaller than 68% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 70 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.
Where it is
Chirpura, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 0 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 350 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 350 m away
- Sand/Morrum Mining Project — environmental approval granted, 550 m away
- Sand/Morrum Mining Project — cleared for impact study, 600 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — more information requested, 800 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — more information requested, 800 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — under environmental review, 1.2 km away