Quick answers
What is this project?
Proposed "Soil Excavation Project" at Gata No. – 14, 12, 22, 13, 20, 21, 18, 26, (Total area 3.3260 Ha.) is an approved mining project in Daryapur, Chunar, Mirzapur, Uttar Pradesh. The site covers 8.2 acres.
Who is building it?
The applicant is Reetu Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 May 2025), as of 27 Nov 2026.
Where is it?
In Daryapur, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 8.2 acres.
When was it filed?
The application was filed on 12 Mar 2025.
Project details
| Official title | proposed "Soil Excavation Project" at Gata No. – 14, 12, 22, 13, 20, 21, 18, 26, (Total area 3.3260 Ha.) located in village – Dariyapur, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh.M/s Srishti Traders Prop. Smt Reetu Singh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 21 May 2025 |
| Application filed | 12 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Reetu Singh |
| Land area | 8.2 acres (3.3 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Daryapur |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02589 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 8.2 acres, this one is larger than 88% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Daryapur, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing unit from 70mt/day to 280mt/day having production of… — environmental approval granted, 4.6 km away
- Environmental Clearance of proposed production of 2,28,000 MTA Milled Steel… — environmental approval granted, 4.6 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — environmental approval granted, 4.8 km away
- Regularization of existing unit having production of 2,37,600 MTA Milled Steel… — cleared for impact study, 4.8 km away
- Kukuhipur Building Stone (Sand Stone) Mining project — environmental approval granted, 5.3 km away
- Chunar Fort (A Unit of Chunar Fort and Palace Pvt. Ltd.), CHUNAR, District… — environmental approval granted, 5.8 km away
- Transfer of Environmental Clearance for "Cement Grinding Unit" at Araji… — environmental approval granted, 6.4 km away
- Environmental Clearance for Proposed River Bed Ordinary Sand Mining Having… — environmental approval granted, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.