Cleared for impact studyMining · Mahoba, Uttar Pradesh

Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 199/1 (Khand No.-08 New), Village- Kumhadaura Maaf, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 2.0 ha.), Shanvi Traders, Prop.- Shri Amit Kumar Yadav S/o Shri Bhagwandas Yadav

Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 199/1 (Khand No.-08 New), Village- Kumhadaura Maaf, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 2.0 ha.), Shanvi Traders, Prop.- Shri Amit Kumar Yadav S/o Shri Bhagwandas Yadav is a proposed mining project in Kumhraura Muaf, Mahoba, Uttar Pradesh. The site covers 4.9 acres. Its stated project cost is ₹69 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 31 Jan 2026).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Granite & Dolostone Ballast Gitti" Project at Gata No.- 199/1 (Khand No.-08 New), Village- Kumhadaura Maaf, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 2.0 ha.), Shanvi Traders, Prop.- Shri Amit Kumar Yadav S/o Shri Bhagwandas Yadav is a proposed mining project in Kumhraura Muaf, Mahoba, Uttar Pradesh. The site covers 4.9 acres.

Who is building it?

The applicant is Amit Kumar Yadav.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 31 Jan 2026), as of 27 Nov 2026.

Where is it?

In Kumhraura Muaf, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹69 lakh and a site of 4.9 acres.

When was it filed?

The application was filed on 30 May 2025.

Project details

StatusCleared for impact study
Status since31 Jan 2026
Application filed30 May 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAmit Kumar Yadav
Land area4.9 acres (2 ha)
Project cost₹69 lakh
Village / localityKumhraura Muaf
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02724

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 18 May 2026Lapsed4.9 acres₹69 lakh
Early planning filed 30 May 2025 (this page)Cleared for impact study4.9 acres₹69 lakh

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is larger than 71% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 12.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.

Where it is

Kumhraura Muaf, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.