Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit Approach to to Property of M/s Linde India Limited is a lapsed building project in Jagdishpur, Hasanganj, Unnao, Uttar Pradesh. The site covers 3.1 acres.
Who is building it?
The applicant is Linde India Limited.
Has it been approved?
No. The application was lapsed on 11 Dec 2025, so it is no longer under consideration.
Where is it?
In Jagdishpur, Hasanganj, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹15 lakh; a site of 3.1 acres and 1,590 m² of forest land.
When was it filed?
The application was filed on 3 Nov 2025.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to to Property of M/s Linde India Limited at Village:- Jagdishpur, Tehsil:- Hasanganj, District:- Unnao |
|---|---|
| Status | Lapsed |
| Status since | 11 Dec 2025 |
| Application filed | 3 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Linde India Limited |
| Land area | 3.1 acres (1.3 ha) |
| Forest land | 1,590 m² |
| Project cost | ₹15 lakh |
| Village / locality | Jagdishpur |
| Taluk / tehsil | Hasanganj |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06212 |
In context
28 applications in Unnao since January 2022 are in the same category (Buildings & townships): 12 approved, 7 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.1 acres, this one is smaller than 86% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jagdishpur, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Excavation Mining" Project at Gata No.- 550मि0, 580मि0, 580मि0,… — environmental approval granted, 1.1 km away
- Improvement and Rectification work of 05 nos. of MoRTH Identified Black Spot… — in-principle approval, conditions pending, 1.3 km away
- "Ordinary Earth Mining Project" at Gata No. – 228 Mi., 318 Mi., 319 Mi. and… — environmental approval granted, 1.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 2.1 km away
- Environmental Clearance for the Proposed Aluminium Can Manufacturing Unit at… — under environmental review, 3.7 km away
- Proposed industrial shed for Manufacturing of Aluminium Beverage Cans by M/s.… — environmental approval granted, 3.9 km away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — environmental approval granted, 3.9 km away
- Proposed Integrated Manufacturing and Logistic Cluster (IMLC) Unnao — cleared for impact study, 3.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.