Quick answers
What is this project?
Proposed project of Sand/Morrum Mining project of Ken River located at Gata No. 333/7 ka Bhag {Khand No.- 01}, lease area- 17.2802 Ha. Village– Marauli Khadar, Tehsil- Banda, District- Banda, Uttar Pradesh by Prop. Shri Sanjeev Kumar Gupta is a proposed mining project in Marauli, Banda, Uttar Pradesh. The site covers 42.7 acres.
Who is building it?
The applicant is Shri Sanjeev Kumar Gupta.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Marauli, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹69 lakh and a site of 42.7 acres.
When was it filed?
The application was filed on 29 Apr 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Oct 2026 |
| Application filed | 29 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shri Sanjeev Kumar Gupta |
| Land area | 42.7 acres (17.3 ha) |
| Project cost | ₹69 lakh |
| Village / locality | Marauli |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04715 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 42.7 acres, this one is larger than 57% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 97.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Marauli, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining Project — environmental approval granted, 0 m away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — under environmental review, 500 m away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Marauli khadar, Gata… — cleared for impact study, 500 m away
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — under environmental review, 800 m away
- "Sand/Morrum Mine" from Riverbed of Ken River, Village- Maraulikhadar, Gata… — cleared for impact study, 800 m away
- Rivedbed Sand/Morrum Mining from Ken Riverbed in Gata No. 333/7 part, 418,… — lapsed, 800 m away
- Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda… — cleared for impact study, 1 km away
- Sand/Morrum Mine in Village – Maraulikhader , Tehsil- Banda, District- Banda… — environmental approval granted, 1.1 km away
More from Shri Sanjeev Kumar Gupta in Banda
- Proposed Sand/Morrum Mining Project on Ken River Bed — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.