Quick answers
What is this project?
Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.- 01, 28, 29/1mi, 61, 26/18, Area- 8.353 ha, Village– Bahdina Achhpura Dariya, Mamrejpur, Tehsil– Maudaha, District- Hamirpur (U.P.) by M/s Shree Ram Infra, Prop. Shri Aman Maurya is a proposed mining project in Bahrita Aharpur Daria, Maudaha, Hamirpur, Uttar Pradesh. The site covers 20.6 acres.
Who is building it?
The applicant is Aman Maurya.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 13 Jan 2026), as of 27 Nov 2026.
Where is it?
In Bahrita Aharpur Daria, Maudaha, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh and a site of 20.6 acres.
When was it filed?
The application was filed on 13 Oct 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Jan 2026 |
| Application filed | 13 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Aman Maurya |
| Land area | 20.6 acres (8.4 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Bahrita Aharpur Daria |
| Taluk / tehsil | Maudaha |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03183 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Apr 2026 | Under environmental review | 20.6 acres | ₹65 lakh |
| Early planning filed 13 Oct 2025 (this page) | Cleared for impact study | 20.6 acres | ₹65 lakh |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 20.6 acres, this one is smaller than 95% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Bahrita Aharpur Daria, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.-… — under environmental review, 0 m away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — cleared for impact study, 550 m away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — initial checks, 550 m away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — cleared for impact study, 550 m away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — returned to applicant, 550 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 2 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 2 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — lapsed, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.