Cleared for impact studyMining · Hamirpur, Uttar Pradesh

Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No. 19/6, Area-36.437 Ha.) Tehsil- Maudaha, District- Hamirpur, Uttar Pradesh Developed by Shri Pramod Kumar Singh

Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No. 19/6, Area-36.437 Ha.) Tehsil- Maudaha, District- Hamirpur, Uttar Pradesh Developed by Shri Pramod Kumar Singh is a proposed mining project in Behdeena Achhpura Dariya, Maudaha, Hamirpur, Uttar Pradesh. The site covers 58.7 acres. Its stated project cost is ₹80 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 9 Feb 2026).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No. 19/6, Area-36.437 Ha.) Tehsil- Maudaha, District- Hamirpur, Uttar Pradesh Developed by Shri Pramod Kumar Singh is a proposed mining project in Behdeena Achhpura Dariya, Maudaha, Hamirpur, Uttar Pradesh. The site covers 58.7 acres.

Who is building it?

The applicant is Pramod Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 9 Feb 2026), as of 27 Nov 2026.

Where is it?

In Behdeena Achhpura Dariya, Maudaha, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹80 lakh and a site of 58.7 acres.

When was it filed?

The application was filed on 30 Oct 2025.

Project details

StatusCleared for impact study
Status since9 Feb 2026
Application filed30 Oct 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorMining
ApplicantPramod Singh
Land area58.7 acres (23.8 ha)
Project cost₹80 lakh
Village / localityBehdeena Achhpura Dariya
Taluk / tehsilMaudaha
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03717

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 5 Oct 2026Initial checks58.7 acres₹80 lakh
Amendment filed 30 Oct 2025 (this page)Cleared for impact study58.7 acres₹80 lakh

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 58.7 acres, this one is larger than 57% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Behdeena Achhpura Dariya, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pramod Singh in Hamirpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.