What is Developing? Open the mapMap

Under environmental reviewMining · Hamirpur, Uttar Pradesh

Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.- 01, 28, 29/1mi, 61, 26/18, Area- 8.353 ha, Village– Bahdina Achhpura Dariya, Mamrejpur, Tehsil– Maudaha, District- Hamirpur (U.P.) by M/s Shree Ram Infra, Prop. Shri Aman Maurya

Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.- 01, 28, 29/1mi, 61, 26/18, Area- 8.353 ha, Village– Bahdina Achhpura Dariya, Mamrejpur, Tehsil– Maudaha, District- Hamirpur (U.P.) by M/s Shree Ram Infra, Prop. Shri Aman Maurya is a proposed mining project in Bahrita Aharpur Daria, Maudaha, Hamirpur, Uttar Pradesh. The site covers 20.6 acres. Its stated project cost is ₹65 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 27 Oct 2026).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.- 01, 28, 29/1mi, 61, 26/18, Area- 8.353 ha, Village– Bahdina Achhpura Dariya, Mamrejpur, Tehsil– Maudaha, District- Hamirpur (U.P.) by M/s Shree Ram Infra, Prop. Shri Aman Maurya is a proposed mining project in Bahrita Aharpur Daria, Maudaha, Hamirpur, Uttar Pradesh. The site covers 20.6 acres.

Who is building it?

The applicant is Aman Maurya.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Bahrita Aharpur Daria, Maudaha, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹65 lakh and a site of 20.6 acres.

When was it filed?

The application was filed on 23 Apr 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.- 01, 28,…

Project details

StatusUnder environmental review
Status since27 Oct 2026
Application filed23 Apr 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantAman Maurya
Land area20.6 acres (8.4 ha)
Project cost₹65 lakh
Village / localityBahrita Aharpur Daria
Taluk / tehsilMaudaha
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04718

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 Apr 2026 (this page)Under environmental review20.6 acres₹65 lakh
Early planning filed 13 Oct 2025Cleared for impact study20.6 acres₹65 lakh

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 20.6 acres, this one is smaller than 95% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Bahrita Aharpur Daria, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.