Quick answers
What is this project?
Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.- 01, 28, 29/1mi, 61, 26/18, Area- 8.353 ha, Village– Bahdina Achhpura Dariya, Mamrejpur, Tehsil– Maudaha, District- Hamirpur (U.P.) by M/s Shree Ram Infra, Prop. Shri Aman Maurya is a proposed mining project in Bahrita Aharpur Daria, Maudaha, Hamirpur, Uttar Pradesh. The site covers 20.6 acres.
Who is building it?
The applicant is Aman Maurya.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Bahrita Aharpur Daria, Maudaha, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh and a site of 20.6 acres.
When was it filed?
The application was filed on 23 Apr 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.- 01, 28,…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 27 Oct 2026 |
| Application filed | 23 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Aman Maurya |
| Land area | 20.6 acres (8.4 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Bahrita Aharpur Daria |
| Taluk / tehsil | Maudaha |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04718 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Apr 2026 (this page) | Under environmental review | 20.6 acres | ₹65 lakh |
| Early planning filed 13 Oct 2025 | Cleared for impact study | 20.6 acres | ₹65 lakh |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 20.6 acres, this one is smaller than 95% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Bahrita Aharpur Daria, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.-… — cleared for impact study, 0 m away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — cleared for impact study, 550 m away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — initial checks, 550 m away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — cleared for impact study, 550 m away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — returned to applicant, 550 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 2 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 2 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — lapsed, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.