What is Developing? Open the mapMap

Cleared for impact studyMining · Hamirpur, Uttar Pradesh

Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No. 19/6, Area-36.437 Ha.) Tehsil- Maudaha, District- Hamirpur, Uttar Pradesh Developed by Shri Pramod Kumar Singh

Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No. 19/6, Area-36.437 Ha.) Tehsil- Maudaha, District- Hamirpur, Uttar Pradesh Developed by Shri Pramod Kumar Singh is a proposed mining project in Tikri Buzurg, Maudaha, Hamirpur, Uttar Pradesh. The site covers 90 acres. Its stated project cost is ₹1.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Aug 2023).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No. 19/6, Area-36.437 Ha.) Tehsil- Maudaha, District- Hamirpur, Uttar Pradesh Developed by Shri Pramod Kumar Singh is a proposed mining project in Tikri Buzurg, Maudaha, Hamirpur, Uttar Pradesh. The site covers 90 acres.

Who is building it?

The applicant is Pramod Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 5 Aug 2023), as of 27 Nov 2026.

Where is it?

In Tikri Buzurg, Maudaha, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.4 crore and a site of 90 acres.

When was it filed?

The application was filed on 5 Aug 2023.

Project details

StatusCleared for impact study
Status since5 Aug 2023
Application filed5 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantPramod Singh
Land area90 acres (36.4 ha)
Project cost₹1.4 crore
Village / localityTikri Buzurg
Taluk / tehsilMaudaha
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01007

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 3 Jan 2025Returned to applicant90 acres₹1.4 crore
Early planning filed 5 Aug 2023 (this page)Cleared for impact study90 acres₹1.4 crore

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 90 acres, this one is larger than 85% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Tikri Buzurg, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pramod Singh in Hamirpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.