Quick answers
What is this project?
Integrated Solid Waste Management Plant for 130 TPD at Nagar Palika Parishad, Banda, Uttar Pradesh by Nagar Palika Parishad, Banda, Uttar Pradesh is a proposed waste management project in Hathethi Purwa, Banda, Uttar Pradesh. The site covers 1.7 acres.
Who is building it?
The applicant is Rajat Verma.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 May 2025), as of 27 Nov 2026.
Where is it?
In Hathethi Purwa, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹752.6 crore and a site of 1.7 acres.
When was it filed?
The application was filed on 24 Feb 2025.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Integrated Solid Waste Management Plant for 130 TPD at Nagar Palika Parishad, Banda,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 May 2025 |
| Application filed | 24 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Rajat Verma |
| Land area | 1.7 acres (0.7 ha) |
| Project cost | ₹752.6 crore |
| Village / locality | Hathethi Purwa |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03522 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Apr 2026 | Environmental approval granted | 1.7 acres | ₹752.6 crore |
| Amendment filed 10 Sept 2025 | Cleared for impact study | 1.7 acres | ₹752.6 crore |
| Early planning filed 24 Feb 2025 (this page) | Cleared for impact study | 1.7 acres | ₹752.6 crore |
In context
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hathethi Purwa, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Solid Waste Management Plant for 130 TPD at Nagar Palika Parishad,… — environmental approval granted, 0 m away
- Integrated Solid Waste Management Plant for 130 TPD at Nagar Palika Parishad,… — cleared for impact study, 0 m away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 1.5 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Neo Crusher… — under environmental review, 2.8 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — environmental approval granted, 2.9 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study, 2.9 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — more information requested, 2.9 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — lapsed, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.