Quick answers
What is this project?
Integrated Solid Waste Management Plant for 130 TPD at Nagar Palika Parishad, Banda, Uttar Pradesh by Nagar Palika Parishad, Banda, Uttar Pradesh is an approved waste management project in Hathethi Purwa, Banda, Uttar Pradesh. The site covers 1.7 acres.
Who is building it?
The applicant is Rajat Verma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Aug 2026), as of 27 Nov 2026.
Where is it?
In Hathethi Purwa, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹752.6 crore and a site of 1.7 acres.
When was it filed?
The application was filed on 18 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Aug 2026 |
| Application filed | 18 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Waste management |
| Applicant | Rajat Verma |
| Land area | 1.7 acres (0.7 ha) |
| Project cost | ₹752.6 crore |
| Village / locality | Hathethi Purwa |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04041 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Apr 2026 (this page) | Environmental approval granted | 1.7 acres | ₹752.6 crore |
| Amendment filed 10 Sept 2025 | Cleared for impact study | 1.7 acres | ₹752.6 crore |
| Early planning filed 24 Feb 2025 | Cleared for impact study | 1.7 acres | ₹752.6 crore |
In context
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hathethi Purwa, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Solid Waste Management Plant for 130 TPD at Nagar Palika Parishad,… — cleared for impact study, 0 m away
- Integrated Solid Waste Management Plant for 130 TPD at Nagar Palika Parishad,… — cleared for impact study, 0 m away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 1.5 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Neo Crusher… — under environmental review, 2.8 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — environmental approval granted, 2.9 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study, 2.9 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — more information requested, 2.9 km away
- "Sand/Morrum Mining" from Riverbed of Ken River — lapsed, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.