What is Developing? Open the mapMap

Under environmental reviewMining · Jalaun, Uttar Pradesh

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 01, Gata No. 596, Area- 16.195 ha

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 01, Gata No. 596, Area- 16.195 ha is a proposed mining project in Basrehi, Kalpi, Jalaun, Uttar Pradesh. The site covers 40 acres. Its stated project cost is ₹45 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 16 Oct 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 01, Gata No. 596, Area- 16.195 ha is a proposed mining project in Basrehi, Kalpi, Jalaun, Uttar Pradesh. The site covers 40 acres.

Who is building it?

The applicant is Pramod Singh.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Basrehi, Kalpi, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹45 lakh and a site of 40 acres.

When was it filed?

The application was filed on 16 Jun 2026.

Project details

Official titleProposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 01, Gata No. 596, Area- 16.195 ha in Village- Basrehi, Tehsil- Kalpi, District- Jalaun, Uttar Pradesh of Shri Pramod Kumar Singh
StatusUnder environmental review
Status since16 Oct 2026
Application filed16 Jun 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantPramod Singh
Land area40 acres (16.2 ha)
Project cost₹45 lakh
Village / localityBasrehi
Taluk / tehsilKalpi
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03939

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40 acres, this one is larger than 52% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 80 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 19 mining leases have applied within 5 km.

Where it is

Basrehi, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pramod Singh in Jalaun

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.