Quick answers
What is "Ordinary Sand Mining" from Riverbed of Ganga River?
"Ordinary Sand Mining" from Riverbed of Ganga River is a proposed mining project in Tarapur Bhitaura, Fatehpur, Uttar Pradesh. The site covers 32.1 acres.
Who is building it?
The applicant is Shaktirock Inframining Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Tarapur Bhitaura, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2.7 crore and a site of 32.1 acres.
When was it filed?
The application was filed on 16 Sept 2026.
Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Ganga River at Village- Tarapur Bhitaura Ehatmali, Khand No.- 01, Gata No.- 02, Lease area- 13.00 Ha., Tehsil- Sadar, District- Fatehpur, Uttar Pradesh, Project Proponent- M/s Shaktirock Inframining Pvt. Ltd. (Director- Shri Kailash Singh Yadav and Smt Parul) |
|---|---|
| Status | Under environmental review |
| Status since | 19 Nov 2026 |
| Application filed | 16 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shaktirock Inframining Private Limited |
| Land area | 32.1 acres (13 ha) |
| Project cost | ₹2.7 crore |
| Village / locality | Tarapur Bhitaura |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04206 |
In context
62 applications in Fatehpur since January 2022 are in the same category (Mining): 42 approved, 18 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 32.1 acres, this one is smaller than 87% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Tarapur Bhitaura, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — in-principle approval, conditions pending, 5.5 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 8.2 km away
- Common Bio Medical Waste Treatment Facility (CBWTF) M/s Gopal Complex Fatehpur — under environmental review, 8.5 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — forest land use approved, 8.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved, 10.2 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — lapsed, 10.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 11 km away