Quick answers
What is Amended BharatNet Project (Damkhauda-Bareilly)?
Amended BharatNet Project (Damkhauda-Bareilly) is a lapsed telecom project in Basupura, Baheri, Bareilly, Uttar Pradesh. The site covers 85.5 acres.
Who is building it?
The applicant is Rail Vikas Nigam Limited (RVNL).
Has it been approved?
No. The application was lapsed on 14 Jun 2026, so it is no longer under consideration.
Where is it?
In Basupura, Baheri, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹30 lakh; a site of 85.5 acres and 1,440 m² of forest land.
When was it filed?
The application was filed on 9 May 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Jun 2026 |
| Application filed | 9 May 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Rail Vikas Nigam Limited (RVNL) |
| Land area | 85.5 acres (34.6 ha) |
| Forest land | 1,440 m² |
| Project cost | ₹30 lakh |
| Village / locality | Basupura |
| Taluk / tehsil | Baheri |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05213 |
In context
8 applications in Bareilly since January 2022 are in the same category (Telecom): 1 approved, 0 filed or under review, and 7 withdrawn, lapsed or rejected.
Where it is
Basupura, Baheri, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Entry/Exit Approach Road to… — forest land use approved, 5 km away
- Protected Forest Land Land Proposed To be diverted for Entry/Exit Approach… — forest land use approved, 8.1 km away
- (Ex- Post Facto) Protected Forest Land Proposed to be Diverted for Entry/Exit… — lapsed, 13 km away
- Proposed Retail Outlet of INDIAN OIL CORPORATION LIMITED at Bareilly-Almora… — lapsed, 13.1 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 13.8 km away
- Nirbhua Soil Mining Project — initial checks, 17.2 km away
- Richauli Soil Mining Project — environmental approval granted, 17.5 km away
- 400 kV D/c Quad Bareilly - Bareilly Line — forest land use approved, 17.6 km away
More from Rail Vikas Nigam Limited (RVNL) in Bareilly
- Amended BharatNet Project (Fatehganj West-Bareilly) — lapsed
- Amended BharatNet Project (Kyara-Bareilly) — lapsed
- Amended Bharatnet Project (Faridpur-Bareilly) — lapsed
- Amended BharatNet Project (Alampur Jafrabad-Bareilly) — lapsed
- Amended Bharat Net — lapsed
6 Rail Vikas Nigam (RVNL) projects in Bareilly
All 82 Rail Vikas Nigam (RVNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.