Quick answers
What is this project?
Proposed Retail Outlet of INDIAN OIL CORPORATION LIMITED at Bareilly-Almora Road (SH-37), Km 51 to Km 52 (LHS) , Khasra no. 27 & 28 , Village- Bhauna, Tehsil- Baheri, District- Bareilly, Uttar pradesh is a lapsed fuel station in Bhaunan, Baheri, Bareilly, Uttar Pradesh. The site covers 0.5 acres.
Who is building it?
The applicant is Harshit Arya.
Has it been approved?
No. The application was lapsed on 27 Sept 2025, so it is no longer under consideration.
Where is it?
In Bhaunan, Baheri, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.5 acres and 880 m² of forest land.
When was it filed?
The application was filed on 12 May 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Sept 2025 |
| Application filed | 12 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Harshit Arya |
| Land area | 2,100 m² |
| Forest land | 880 m² |
| Project cost | ₹50 lakh |
| Village / locality | Bhaunan |
| Taluk / tehsil | Baheri |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05636 |
In context
25 applications in Bareilly since January 2022 are in the same category (Fuel stations): 17 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.5 acres, this one is smaller than 70% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhaunan, Baheri, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- (Ex- Post Facto) Protected Forest Land Proposed to be Diverted for Entry/Exit… — lapsed, 100 m away
- Richauli Soil Mining Project — environmental approval granted, 4.5 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit Approach Road to… — forest land use approved, 9.4 km away
- Amended BharatNet Project (Damkhauda-Bareilly) — lapsed, 13.1 km away
- Protected Forest Land Land Proposed To be diverted for Entry/Exit Approach… — forest land use approved, 19.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 25.9 km away
- Nirbhua Soil Mining Project — initial checks, 26 km away
- Protected Forest Land Proposed to be diverted for Entry/Exit Approach road to… — forest land use approved, 27.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.