Quick answers
What is this project?
(Ex- Post Facto) Protected Forest Land Proposed to be Diverted for Entry/Exit Approach Road To Reliance BP Mobility Limited Retail Outlet At Bareilly -Almora Road (SH-37), Km. 51 (LHS), Khasra No. 02Min, Village- Mandanpur, Tehsil Baheri, District -Bareilly, Uttar Pradesh is a lapsed fuel station in Chandmuriya, Baheri, Bareilly, Uttar Pradesh. The site covers 1.5 acres.
Who is building it?
The applicant is Reliance Bp Mobility Limited Up (West).
Has it been approved?
No. The application was lapsed on 15 Aug 2026, so it is no longer under consideration.
Where is it?
In Chandmuriya, Baheri, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 1.5 acres and 2,210 m² of forest land.
When was it filed?
The application was filed on 16 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Aug 2026 |
| Application filed | 16 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Reliance Bp Mobility Limited Up (West) |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 2,210 m² |
| Project cost | ₹60 lakh |
| Village / locality | Chandmuriya |
| Taluk / tehsil | Baheri |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06178 |
In context
25 applications in Bareilly since January 2022 are in the same category (Fuel stations): 17 approved, 1 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 1.5 acres, this one is larger than 78% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandmuriya, Baheri, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Retail Outlet of INDIAN OIL CORPORATION LIMITED at Bareilly-Almora… — lapsed, 100 m away
- Richauli Soil Mining Project — environmental approval granted, 4.6 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit Approach Road to… — forest land use approved, 9.3 km away
- Amended BharatNet Project (Damkhauda-Bareilly) — lapsed, 13 km away
- Protected Forest Land Land Proposed To be diverted for Entry/Exit Approach… — forest land use approved, 19.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 25.8 km away
- Nirbhua Soil Mining Project — initial checks, 25.9 km away
- Protected Forest Land Proposed to be diverted for Entry/Exit Approach road to… — forest land use approved, 27 km away
All 23 Reliance Bp Mobility projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.