Quick answers
What is "Sand/Morrum Mining" from Riverbed of Yamuna River?
"Sand/Morrum Mining" from Riverbed of Yamuna River is a proposed mining project in Manki Kalan, Hamirpur, Uttar Pradesh. The site covers 59.3 acres.
Who is building it?
The applicant is Shreyansh Jain.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Manki Kalan, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2.7 crore and a site of 59.3 acres.
When was it filed?
The application was filed on 10 Apr 2026.
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Yamuna River at Village- Mankikala Thok Dariya, Gata No.- 1/5, Khand No.- 1, lease area- 24.00 Ha., Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh, Project Proponent- Prakrati Excavating Private Limited (Director- Shri Shreyansh Jain) |
|---|---|
| Status | Under environmental review |
| Status since | 18 Oct 2026 |
| Application filed | 10 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shreyansh Jain |
| Land area | 59.3 acres (24 ha) |
| Project cost | ₹2.7 crore |
| Village / locality | Manki Kalan |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04872 |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 59.3 acres, this one is larger than 58% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Manki Kalan, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to… — in-principle approval, conditions pending, 19.7 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 21.9 km away
- Construction of 200 Bedded Hospital and Trauma Center — environmental approval granted, 25.9 km away
- Construction of 200 Bedded Hospital and Trauma Center — returned to applicant, 25.9 km away
- Proposed Forest Land to be diverted for New Construction of Road — more information requested, 27.6 km away
- "Development of Economic Corridors, Inter Corridors and Feeder Routes to… — under forest review, 28.7 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 29.1 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — returned to applicant, 29.7 km away
More from Shreyansh Jain in Hamirpur
- Proposed Project of riverbed Sand/Morrum Mining from Riverbed of Betwa River… — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.