Quick answers
What is this project?
Proposed protected forest land to be diverted for Entry/Exit approach to Bharat Petroleum Corporation Limited Retail Outlet is a proposed fuel station in Damar, Hamirpur, Uttar Pradesh. The site covers 0.9 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Damar, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 0.9 acres and 1,970 m² of forest land.
When was it filed?
The application was filed on 11 Jun 2024.
Project details
| Official title | Proposed protected forest land to be diverted for Entry/Exit approach to Bharat Petroleum Corporation Limited Retail Outlet at Village: - Damar, Tehsil: -Hamirpur, District: - Hamirpur |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 30 Sept 2026 |
| Application filed | 11 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,600 m² |
| Forest land | 1,970 m² |
| Project cost | ₹65 lakh |
| Village / locality | Damar |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05749 |
In context
13 applications in Hamirpur since January 2022 are in the same category (Fuel stations): 5 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.9 acres, this one is smaller than 54% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Damar, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 4.2 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — returned to applicant, 10.1 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — cleared for impact study, 10.1 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — initial checks, 10.1 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — cleared for impact study, 10.1 km away
- Construction of 200 Bedded Hospital and Trauma Center — environmental approval granted, 10.2 km away
- Construction of 200 Bedded Hospital and Trauma Center — returned to applicant, 10.2 km away
- Proposed project of Sand/Morrum Mining project at Khand No.-19/13, Gata No.-… — under environmental review, 10.6 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Hamirpur
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — more information requested
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — in-principle approval, conditions pending
4 Bharat Petroleum Corporation (BPCL) projects in Hamirpur
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.