Quick answers
What is this project?
Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Kurara, Hamirpur, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 13 Feb 2026), as of 27 Nov 2026.
Where is it?
In Kurara, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0.8 acres and 1,930 m² of forest land.
When was it filed?
The application was filed on 7 Nov 2024.
Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet at Village:-Kurara, Tehsil:- Hamirpur, District:-Hamirpur. |
|---|---|
| Status | Forest land use approved |
| Status since | 13 Feb 2026 |
| Application filed | 7 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 3,200 m² |
| Forest land | 1,930 m² |
| Project cost | ₹55 lakh |
| Village / locality | Kurara |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05812 |
In context
13 applications in Hamirpur since January 2022 are in the same category (Fuel stations): 5 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.8 acres, this one is smaller than 85% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kurara, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to… — in-principle approval, conditions pending, 4.2 km away
- Construction of 200 Bedded Hospital and Trauma Center — environmental approval granted, 6 km away
- Construction of 200 Bedded Hospital and Trauma Center — returned to applicant, 6 km away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — environmental approval granted, 8.5 km away
- Proposed Project of Riverbed Sand/Morrum Mining from Riverbed of Betwa River… — cleared for impact study, 8.5 km away
- "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 18/1, Area… — returned to applicant, 8.6 km away
- "Morrum Mining" from Riverbed of Betwa River — under environmental review, 8.9 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — returned to applicant, 9.1 km away
More from Indian Oil Corporation Limited (IOCL) in Hamirpur
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested
- Proposed Forest land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
7 Indian Oil Corporation (IOCL) projects in Hamirpur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.