What is Developing? Open the mapMap

LapsedMining · Hamirpur, Uttar Pradesh

"Morrum Mining Project" on the riverbed of River Betwa at Khand No. 10/5(Bindpuri- Gata No. 244,245,246,247, Indrapuri- Gata No.-255/1,256,257, Bajehata-Gata No.-01), Mining Lease Area 24.321 hectares

"Morrum Mining Project" on the riverbed of River Betwa at Khand No. 10/5(Bindpuri- Gata No. 244,245,246,247, Indrapuri- Gata No.-255/1,256,257, Bajehata-Gata No.-01), Mining Lease Area 24.321 hectares is a lapsed mining project in Bajehta Daria, Maudaha, Hamirpur, Uttar Pradesh. The site covers 60.1 acres. Its stated project cost is ₹95 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 23 Nov 2026).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Morrum Mining Project" on the riverbed of River Betwa at Khand No. 10/5(Bindpuri- Gata No. 244,245,246,247, Indrapuri- Gata No.-255/1,256,257, Bajehata-Gata No.-01), Mining Lease Area 24.321 hectares is a lapsed mining project in Bajehta Daria, Maudaha, Hamirpur, Uttar Pradesh. The site covers 60.1 acres.

Who is building it?

The applicant is Mastergenie Services Private Limited.

Has it been approved?

No. The application was lapsed on 23 Nov 2026, so it is no longer under consideration.

Where is it?

In Bajehta Daria, Maudaha, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹95 lakh and a site of 60.1 acres.

When was it filed?

The application was filed on 18 Jul 2026.

Project details

Official title"Morrum Mining Project" on the riverbed of River Betwa at Khand No. 10/5(Bindpuri- Gata No. 244,245,246,247, Indrapuri- Gata No.-255/1,256,257, Bajehata-Gata No.-01), Mining Lease Area 24.321 hectares situated in Village- Bindpuri, Indrapuri, Bajehata, Tehsil- Hamirpur Maudaha, Distt-Hamirpur (U.P.)
StatusLapsed
Status since23 Nov 2026
Application filed18 Jul 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantMastergenie Services Private Limited
Land area60.1 acres (24.3 ha)
Project cost₹95 lakh
Village / localityBajehta Daria
Taluk / tehsilMaudaha
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04919

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 60.1 acres, this one is larger than 64% of them.

No other mining lease on record is within 500 m of this site; 15 have applied within 5 km.

Where it is

Bajehta Daria, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.