What is Developing? Open the mapMap

Returned to applicantMining · Hamirpur, Uttar Pradesh

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 10/4, Area 26.315 ha

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 10/4, Area 26.315 ha is a proposed mining project in Bajehta Daria, Maudaha, Hamirpur, Uttar Pradesh. The site covers 65 acres. Its stated project cost is ₹6.3 crore. As of 27 Nov 2026, its status is “Returned to applicant” (since 21 Jan 2025).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 10/4, Area 26.315 ha is a proposed mining project in Bajehta Daria, Maudaha, Hamirpur, Uttar Pradesh. The site covers 65 acres.

Who is building it?

The applicant is Pramod Singh.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Bajehta Daria, Maudaha, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹6.3 crore and a site of 65 acres.

When was it filed?

The application was filed on 6 May 2024.

Project details

Official titleProposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 10/4, Area 26.315 ha in Village- Beri, Tehsil- Hamirpur, District- Hamirpur, Uttar Pradesh of Shri Pramod Kumar Singh
StatusReturned to applicant
Status since21 Jan 2025
Application filed6 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantPramod Singh
Land area65 acres (26.3 ha)
Project cost₹6.3 crore
Village / localityBajehta Daria
Taluk / tehsilMaudaha
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02409

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 65 acres, this one is larger than 68% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 118.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.

Where it is

Bajehta Daria, Maudaha, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pramod Singh in Hamirpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.