What is Developing? Open the mapMap

LapsedMining · Hamirpur, Uttar Pradesh

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 10/4, Gata No. 244, 247, 248, 01, Area :- 21.590 ha (53.32Acre)

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 10/4, Gata No. 244, 247, 248, 01, Area :- 21.590 ha (53.32Acre) is a lapsed mining project in Bindpuri, Hamirpur, Uttar Pradesh. The site covers 53.3 acres. Its stated project cost is ₹43 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 7 Nov 2026).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 10/4, Gata No. 244, 247, 248, 01, Area :- 21.590 ha (53.32Acre) is a lapsed mining project in Bindpuri, Hamirpur, Uttar Pradesh. The site covers 53.3 acres.

Who is building it?

The applicant is Pramod Singh.

Has it been approved?

No. The application was lapsed on 7 Nov 2026, so it is no longer under consideration.

Where is it?

In Bindpuri, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹43 lakh and a site of 53.3 acres.

When was it filed?

The application was filed on 10 Jun 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at…

Project details

Official titleProposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 10/4, Gata No. 244, 247, 248, 01, Area :- 21.590 ha (53.32Acre) in Village- Bindpuri, Bajehata (Old Name Beri) Tehsil- Hamirpur, Maudaha, District- Hamirpur, Uttar Pradesh of Shri Pramod Kumar Singh.
StatusLapsed
Status since7 Nov 2026
Application filed10 Jun 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantPramod Singh
Land area53.3 acres (21.6 ha)
Project cost₹43 lakh
Village / localityBindpuri
Taluk / tehsilHamirpur
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04584

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 10 Jun 2026 (this page)Lapsed53.3 acres₹43 lakh
Early planning filed 8 Sept 2025Cleared for impact study53.3 acres₹43 lakh

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 53.3 acres, this one is larger than 54% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 118.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.

Where it is

Bindpuri, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pramod Singh in Hamirpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.