Quick answers
What is this project?
Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 10/4, Gata No. 244, 247, 248, 01, Area :- 21.590 ha (53.32Acre) is a proposed mining project in Bindpuri, Hamirpur, Uttar Pradesh. The site covers 53.3 acres.
Who is building it?
The applicant is Pramod Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Dec 2025), as of 27 Nov 2026.
Where is it?
In Bindpuri, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹43 lakh and a site of 53.3 acres.
When was it filed?
The application was filed on 8 Sept 2025.
Project details
| Official title | Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa River at Khand No. 10/4, Gata No. 244, 247, 248, 01, Area :- 21.590 ha (53.32Acre) in Village- Bindpuri, Bajehata (Old Name Beri) Tehsil- Hamirpur, Maudaha, District- Hamirpur, Uttar Pradesh of Shri Pramod Kumar Singh. |
|---|---|
| Status | Cleared for impact study |
| Status since | 24 Dec 2025 |
| Application filed | 8 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Pramod Singh |
| Land area | 53.3 acres (21.6 ha) |
| Project cost | ₹43 lakh |
| Village / locality | Bindpuri |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03853 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Jun 2026 | Lapsed | 53.3 acres | ₹43 lakh |
| Early planning filed 8 Sept 2025 (this page) | Cleared for impact study | 53.3 acres | ₹43 lakh |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 53.3 acres, this one is larger than 54% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 118.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Bindpuri, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — lapsed, 0 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — returned to applicant, 50 m away
- "Morrum Mining Project" on the riverbed of River Betwa at Khand No.… — lapsed, 650 m away
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — returned to applicant, 2.4 km away
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — cleared for impact study, 2.4 km away
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — initial checks, 2.4 km away
- " Sand/Morrum Mine" from Riverbed of Betwa River, Village- Beri (Khand No.… — cleared for impact study, 2.4 km away
- Sand/Morrum Mining along Betwa Riverbed, Khand No 10/21, Village-Indrapuri,… — more information requested, 2.7 km away
More from Pramod Singh in Hamirpur
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — initial checks
- Sand/Morrum Mining along Betwa Riverbed in Gata no- 35/1, 65/35, 39, 40/1,… — under environmental review
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — cleared for impact study
- "Sand/Morrum Mining" from Riverbed of Ken River — cleared for impact study
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Tikapur, (Khand No.… — returned to applicant
- "Sand/Morrum Mining" from Riverbed of Ken River — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.